# PPA, Article 89. Principles for the award of social and other specific services

- URL: https://procurelex.be/en/act/89 · Nederlands: https://procurelex.be/nl/wet/89
- Act of 17 June 2016 on public procurement, consolidated version in force from 2026-02-17; consolidated Dutch text (prevails): https://www.ejustice.just.fgov.be/eli/wet/2016/06/17/2016021053/justel

§ 1 Depending on the nature and characteristics of the need to be met, the contracting authority may, for the award of the service contracts referred to in Article 88:
   1° have recourse to the simplified negotiated procedure with prior publication;
   2° have recourse to the negotiated procedure without prior publication insofar as the estimated amount of the contract is lower than EUR 750,000 or, where the estimated amount of the contract is equal to or higher than that threshold, in the cases of application referred to in Article 42, § 1, 1°, b, c and d, 2°, 3°, 4° and 5°;
   3° refer expressly to one of the award procedures or purchasing techniques referred to in Chapters 2 and 3, with the exception of the simplified negotiated procedure with prior publication and of the negotiated procedure without prior publication, without it necessarily being required that the conditions for the application of those procedures be met;
   4° have recourse to a procedure sui generis with prior publication, the detailed rules of which it determines itself.
The procedures referred to in the first paragraph must in any event respect the principles of transparency, proportionality and equal treatment of economic operators.
The contracting authority shall specify either the relative weighting which it attaches to each of the chosen criteria for the determination of the most economically advantageous tender, or the descending order of their importance. Otherwise, the award criteria have the same value.
§ 2 Where the contracting authority, in accordance with § 1, first paragraph, 1°, applies the simplified negotiated procedure with prior publication, it is required to comply at least with the provisions contained in Title 1, Chapter 1 and Articles 41, §§ 2 to 7, 51, 52, 59, 66, §§ 1 and 3, 67 to 71, 73, 74, 78, 80 to 82, 85 to 87 of Title 2, Title 4, as well as Chapter 1 of Title 5.
The other provisions of the Act do not apply, unless the procurement documents provide otherwise.
The contracting authority may decide to examine the tenders before verifying, on the one hand, the absence of exclusion grounds and, on the other hand, compliance with the selection criteria, which it determines freely. Where it makes use of this possibility, it shall ensure that the verification of the absence of grounds for exclusion and of compliance with the selection criteria takes place in an impartial and transparent manner, so that no contract is awarded to a tenderer who should have been excluded or who does not meet the selection criteria imposed by the contracting authority.
§ 3 Where the contracting authority, in accordance with § 1, first paragraph, 2°, applies the negotiated procedure without prior publication, it is required to comply at least with the provisions contained in Title 1, Chapter 1 and Articles 42, § 2, 51, 52, 59, 66, §§ 1 and 3, 67, 68, 70, 73, 74, 78, 81, 82, 85 to 87 of Title 2, Title 4, as well as Chapter 1 of Title 5.
The contracting authority may decide to examine the tenders before verifying the absence of exclusion grounds. Where it makes use of this possibility, it shall ensure that the verification of the absence of grounds for exclusion takes place in an impartial and transparent manner, so that no contract is awarded to a tenderer who should have been excluded.
The other provisions of the Act do not apply, unless the procurement documents provide otherwise.
§ 4 Where the contracting authority chooses to apply § 1, first paragraph, 3°, it is required to apply in full the award procedure to which it refers and is subject to the provisions of this Act.
§ 5 Where the contracting authority chooses to apply § 1, first paragraph, 4°, it is required to comply at least with the provisions of Title 1, of Chapter 1 of Title 2, Chapter 1 of Title 5, as well as Articles 67, 68 and 70.
The contracting authority may decide to examine the tenders before verifying the absence of exclusion grounds. Where it makes use of this possibility, it shall ensure that the verification of the absence of grounds for exclusion takes place in an impartial and transparent manner, so that no contract is awarded to a tenderer who should have been excluded.
It is likewise required to apply the detailed rules which it has itself determined. In order to determine those rules, it may:
   1° draw inspiration from the award procedures and purchasing techniques provided for in this Title; or
   2° refer to certain articles of the award procedures and purchasing techniques provided for in this Title and, where appropriate, provide for derogations.