# Performance Decree, Article 43. Inspection carried out a posteriori

- URL: https://procurelex.be/en/performance-decree/43 · Nederlands: https://procurelex.be/nl/kb-uitvoering/43
- Royal Decree of 14 January 2013 establishing the general rules for the performance of public contracts, consolidated version in force from 2025-01-01; consolidated Dutch text (prevails): https://www.ejustice.just.fgov.be/eli/besluit/2013/01/14/2013021005/justel
- Amended by: KB 2017-06-22/01, art. 2 (in force 30-06-2017)

§ 1 Regardless of whether a prior inspection is provided for, an inspection may be carried out a posteriori, after the performance of the services, for the categories of services specified in the procurement documents.
These inspections and the taking of samples shall take place in the presence of both parties, in accordance with the requirements of the procurement documents which specify their scope in more detail.
§ 2 The contracting body shall communicate the results of the inspection within the following periods after its performance:
   1° thirty days;
   2° sixty days if the inspection formalities take place in a laboratory.
The procurement documents may, however, provide for shorter periods.
§ 3 For services that are subject to an inspection carried out a posteriori:
   1° either a specific additional surety is provided for;
   2° or a deduction is made from the payments for those services until the results of the inspection are known.
