# Performance Decree, Article 62

- URL: https://procurelex.be/en/performance-decree/62 · Nederlands: https://procurelex.be/nl/kb-uitvoering/62
- Royal Decree of 14 January 2013 establishing the general rules for the performance of public contracts, consolidated version in force from 2025-01-01; consolidated Dutch text (prevails): https://www.ejustice.just.fgov.be/eli/besluit/2013/01/14/2013021005/justel
- Amended by: KB 2017-06-22/01, art. 2 (in force 30-06-2017); KB 2017-06-22/01, art. 29 (in force 30-06-2017)

Without prejudice to the application of an ex officio measure, the contracting body may terminate the contract where the contractor is in a situation of:
   1° one of the exclusion grounds referred to in Articles 67 to 69 of the Act, Articles 61 to 63 of the Royal Decree on the classical sectors, Articles 67 and 68 of the Royal Decree on the special sectors or Article 63 of the Royal Decree on defence and security, as the case may be, except in the event of application of the legislation on the continuity of undertakings, and with the exception of the optional exclusion ground relating to conflicts of interest;
   2° placement under assistance on account of prodigality;
   3° declaration of incapacity, provisional placement under administration or placement under guardianship on account of mental weakness;
   4° placement under observation or internment in application of the legislation on the protection of society;
   5° ...
The possibility of termination referred to in the first paragraph, 1°, also applies where the contractor was in a mandatory exclusion ground referred to in Article 67 of the Act at the time of the award, and should therefore have been excluded. This possibility of termination does not, however, affect the possibility for the contractor who is in a situation of exclusion to prove that the measures he has taken are sufficient to demonstrate his reliability, despite the applicable exclusion ground. The contractor may still submit these corrective measures during the period referred to in Article 44, § 2.
The contractor has the possibility of still regularising his position as regards social and tax debts, a possibility which may be used only once in the course of performance.
The second and third paragraphs do not apply to contracts falling within the scope of the Defence and Security Act.