# Performance Decree, Article 65

- URL: https://procurelex.be/en/performance-decree/65 · Nederlands: https://procurelex.be/nl/kb-uitvoering/65
- Royal Decree of 14 January 2013 establishing the general rules for the performance of public contracts, consolidated version in force from 2025-01-01; consolidated Dutch text (prevails): https://www.ejustice.just.fgov.be/eli/besluit/2013/01/14/2013021005/justel
- Amended by: KB 2014-02-07/10, art. 72 (in force 03-03-2014); KB 2017-06-22/01, art. 2 (in force 30-06-2017)

§ 1 The guarantee provided by the contractor is governed by the provisions of this Article and, where applicable, by the additional provisions of the procurement documents.
§ 2 A report, dated and signed by the supervising official, must be drawn up of any damage or putting out of service.
That report must be drawn up before the expiry of the guarantee period and served on the contractor within thirty days.
The contractor is liable only if those formalities have been complied with.
§ 3 Without prejudice to Article 84, the contractor shall replace, at his own expense and within the period imposed, in accordance with the original requirements, the products that exhibit defects which do not permit use in conformity with the conditions of the contract or that are put out of service in the course of the guarantee period under normal service use.
Damage attributable to chance, force majeure or abnormal use of the products supplied is not covered by the guarantee, unless the incident brings to light poor workmanship or a defect which is a reason to demand replacement.
All products taken out of service in the course of the guarantee period and whose replacement is the responsibility of the contractor shall be kept at his disposal and shall be removed by him within the period imposed on him, which starts on the day on which he was notified thereof. Upon expiry of this period, the contracting body becomes the owner of these items, unless the contractor has requested in writing, within this period, that they be returned at his expense and risk.
§ 4 Where the contractor does not proceed with the replacement referred to in paragraph 3, he shall pay the value, including VAT, of the products to be replaced and the costs, likewise including VAT, connected with that replacement.
The contracting body may, however, agree that damage which occurred during the guarantee period be repaired by the contractor at his own expense.
Where the repair is carried out in the workshops of the contracting body, the account to be submitted comprises the value of the raw materials and the labour costs, increased by the corresponding share of the general overheads of the workshops of the contracting body.
§ 5 The guarantee period applies in full to products supplied as replacements.
The guarantee period is extended, where applicable, by the time during which the product could not be used as a result of damage.